Traffic management plans

A traffic management plan sets out how traffic will move through, around or past your work for the duration of it. It is a drawing plus the reasoning behind it — and it is also the document a municipality reads before deciding whether to let you occupy the road.

01Traffic Management Plans

When you need one

The trigger varies by municipality, but the pattern is consistent: a plan is required when the work affects a road that matters. In Surrey, a plan must be submitted to and accepted by the City’s Traffic Management Section before a Traffic Obstruction Permit issues, where the obstruction affects an arterial or collector — or where there is a significant obstruction such as a temporary full closure on a local road. Plans must be site, segment or phase specific and include site-specific drawings. Minor obstructions on local roads generally do not require one.

02Traffic Management Plans

The standard

Plans are drawn to the BC Traffic Management Manual 2020 and the Ministry of Transportation and Infrastructure’s Traffic Management Manual for Work on Roadways. Municipal roads and provincial highways share this design standard even though the permit comes from different authorities.

03Traffic Management Plans

What is in the plan

  • Site-specific drawings — not a generic template with your address on it
  • Phasing, where the work changes shape over time
  • Device placement, spacing and taper lengths for the posted speed
  • Pedestrian and cyclist provision, including detours
  • Transit stop impacts where routes are affected
  • Access maintained for driveways, businesses and emergency services
  • Hours of operation and any restricted periods

04Traffic Management Plans

Permits — who issues what

Municipal roads are permitted by the city’s traffic engineering department; provincial highways by the Ministry of Transportation and Infrastructure under a separate process. Getting this wrong is a common and expensive mistake: a plan submitted to the wrong authority is not rejected quickly, it just sits. Municipal applications are typically processed in three to seven business days, so a plan that comes back for revision can cost a week.

Exhibit 01Permits — who issues what
MunicipalityPermitIssuing authority
SurreyTraffic Obstruction PermitTraffic Management Section
VancouverStreet Use PermitTraffic engineering
Source: City of Surrey published requirements. Vancouver instrument pending confirmation with the City.